2013-09-18 11:33Engraving machine test machine running Precautions

Engraving machine equipment ready, the engraving machine adsorption tube insert vacuum suction from the back part of the frame, with a pipe, tube connection tube access cleaner, start the machine switch, all equipment is in an open state, the six adsorption partition switch machine in front of the material on the table not drag open later, firmly adsorbed on the table, open the cover, hand feeling two pipe suction; handle the machine after reset after the left and right up and down movement, which prove the machine can run normally.