Stone engraving machine to do routine maintenance_我的网站

济南江河数控

中文版 | ENGLISH | РУССКИЙ

Your position:主页 > TECHNOLOGY >

江河数控、雕刻机

2013-10-10 11:46Stone engraving machine to do routine maintenance

1, running time 10 hours a day, to ensure the normal work of cleaning and water pump cooling water, must not make water spindle motor timing replacement there was a shortage of water, cooling water, in order to prevent the water temperature is too high. Winter if the ambient temperature is too low in the water tank inside the water with antifreeze.

2, each stone engraving machine after use, should pay attention to clean up, make sure the platform and drive to clean up dust on a regular basis (weekly) on the transmission system (X, Y, Z axis) lubricating oil. (Note: X, Y, Z axis rod engine oil maintenance; screw part plus high-speed butter; winter temperature is too low if the work environment screw, rod (square or circular guide rail) part should be rinsed clean with gasoline , then add the oil, otherwise it will cause excessive resistance machine transmission parts dislocation caused by the machine.
3, engraving machine maintenance checks, be sure to cut off the power supply when the monitor is blank and the power indicator light turns off the main circuit before proceeding.
Add: No.999 Hualong Road, Jinan city, China
TEL:86-0531-89001332 13864197735 18906416766